Overdue (plumbing)

For years, I have wondered about rectifying the horrible plumbing we inherited in our back yard. It always seemed a little silly, since it would involve breaking up part of the patio we had installed. The exact tiles we used are no longer available, so the new ones wouldn’t match perfectly.

But recently I asked our contractor about it, and he said no problem! And when he says that, he means it.

Not only did the drain include a zigzag design, it also had a buried (inaccessible) elbow and substandard pipe, some of which turned out to have been broken.

I don’t find most construction projects particularly gratifying, but this improvement is actually exciting. Because, you see, three or four times a year I had to pry up all the junction box covers, put on long rubber gloves, and force a stiff plastic tube through the pipes connecting them—and yes, the one with the elbow was a bitch—when they got clogged up with grease that shouldn’t have, but somehow got beyond the grease trap.

Nasty job. No more!

BTW the gray square on the garage floor is a closed-off junction box. From four to two—so delightfully uncomplicated!

2 thoughts on “Overdue (plumbing)

Leave a Reply to TXsasquatch Cancel reply

Your email address will not be published. Required fields are marked *