Beyond the corner, the builders buried about 50 meters of culvert, inaccessible except from either end, eliminating the drainage ditch. I could have told them this was a bad idea. A few days later, I didn’t need to. Simply demonstrates that the private sector can match the incompetence of the public sector.
One thought on “Another engineering FAIL”